Tell us about your site and your goals. We respond to every enquiry within one working day.
The more you can share, the faster and sharper our response will be.
For rooftop systems below 1 MWp, typical end-to-end timelines are 10 to 16 weeks from contract signing — covering site survey, structural assessment, design, statutory approvals, procurement and installation. Ground-mount and large-scale projects take longer; we share a candid milestone plan during proposal.
Yes. We support customer-funded CAPEX, third-party-financed OPEX (PPA-style) and lease/hybrid arrangements. The right structure depends on your balance sheet preferences, tax position, and tariff savings target — we model all three at proposal stage.
Tier-1 mono-PERC, TOPCon and bifacial modules from listed manufacturers, paired with smart string inverters with full remote monitoring. Battery systems are LFP or NMC chemistry depending on use-case, with BMS, EMS and grid-tie integration designed in-house.
Yes — Annual Maintenance Contracts are a core offering, including scheduled cleaning, electrical testing, real-time monitoring, vegetation control, and first-response within agreed SLAs. We design your asset for a 25-year life and stay with it.
Headquartered in Gujarat with operational projects extending into Haryana and across the broader north-west industrial corridor. We accept enquiries from across India and select feasible projects on the basis of site fit and economic viability.
For most use cases, green hydrogen is at the pilot or feasibility stage rather than full-scale rollout. We help heavy-industry customers run feasibility studies, model levelised cost, and design pilot integrations now so they're positioned when economics tip.